The Residence at Bala Cynwyd

Wagman’s Geotechnical Construction Group designed and installed four soil nail and shotcrete walls in Montgomery County, PA.

7th and Walnut

Wagman’s Geotechnical Construction Group was part of a team that designed the temporary excavation support for this major project in downtown Allentown, Pa.

Potters Mills, Route 322

Wagman’s Geotechnical Construction group supplied the geotechnical construction needs for the Potters Mills project in Centre County, Pa. The $4.68M project consisted of the widening and realignment of state Route 322. The contract was for a design-build of approximately 50,000 SF of soil nail slope treatment with wire mesh, nearly 12,000 SF of temporary support […]

SR 180 Permanent Soil Nail and Shotcrete Wall

Wagman’s Geotechnical Construction group’s $448,000 contract addressed construction challenges at Williamsport SR 180 for PennDOT. Wagman installed a permanent soil nail wall, located beneath two overpass bridges at the location of the SR 180 highway in Williamsport, PA. The aesthetically pleasing wall is over 420 feet long and consists of more than 220 permanent soil […]