Wagman’s Geotechnical Construction group is installing drilled shafts as part of a design-build project in Statesville, NC.
Service Archives:
Guilford Reservoir
Wagman’s Geotechnical Construction group installed 372 caissons to support two, 6.5M gallon prestressed concrete tanks at Guilford Reservoir, located in Baltimore, Md. The project’s goal was to replace the open reservoir with two underground tanks that supply the city of Baltimore with tap water. Polymer slurry was used to maintain sidewall stability during the caisson […]
Chapel Hill Soldier Pile Wall
Wagman Heavy Civil, Inc. and Wagman’s Geotechnical Construction group provided all necessary equipment, tools and personnel for the construction of a retaining wall in Chapel Hill, NC.
I-95 HOV / HOT Lanes
Wagman’s Geotechnical Construction group completed the construction of the I-95 HOV/HOT Lanes Post and Panel Wall in Springfield, Va.