Wagman’s Geotechnical Construction Group was contracted to furnish and install limited mobility grout for sinkhole repair in Butler Pike where it crosses an unnamed tributary in Plymouth Creek.
Service Archives:
Bucknell University Freeman College of Art and Art History
Wagman’s Geotechnical Construction Group teamed with local geotechnical consultants and engineers to design and install compaction grouting points to improve existing soil conditions at Bucknell University’s Freeman College of Art & Art History.
Lehigh Valley Health Network
Wagman’s Geotechnical Construction group was contracted to perform preconstruction compaction grouting for a new medical facility on the Lower Nazareth Campus of the Lehigh Valley Health Network in Easton, Pa.