Wagman Heavy Civil Project

Nottoway River Bridge Repairs

  • Location

    Southampton, VA

Wagman Heavy Civil served as a subcontractor for Crowder Construction to pour latex on the Nottoway River Bridge project in Southampton, VA. The project originally planned for a 4”- 6” depth, Class A4 mod concrete overlay. But after hydro-demolition caused blow throughs due to differing conditions under existing asphalt, VDOT changed the scope to mill and latex overlay.

Wagman’s scope of work included 286 CY of LMC that was placed on 5,134 SY of deck. The project team also had to do surface preparation by the means of shotblasting prior to the LMC placement. This project was completed in two phases, roughly three months apart.

Key Challenges & Project Details

  • The 1,200 FT long bridge was done in five pours between the two phases, utilizing three mobile mixers.
  • Wagman also completed the grooving done in Phase 2.