DreamWrights Center for Community Arts partnered exclusively with Wagman’s Special Projects Group to investigate and resolve a failing ceiling assembly within its facility. Working on a time-and-materials basis, Wagman evaluated the existing conditions, identified the root cause of the issue, and developed a cost-effective repair solution.
The team determined that the existing sprinkler system was inadequately secured to the building structure, contributing to the ceiling failure. Wagman collaborated with a local sprinkler contractor to develop and implement a corrective plan before completing repairs to the ceiling assembly. Through continued investigation and value engineering during construction, the team identified a more efficient solution than originally anticipated, allowing the project to be completed in approximately one week for $20,000 and returning more than $3,000 in savings to the client.
Most recently, Wagman’s Special Projects Group completed DreamWrights Phase II renovations in 2021, as well as other renovation projects in 2006 and 2017.
Key Challenges & Project Details
- Investigated the cause of a failing ceiling assembly and developed a practical, cost-effective repair solution.
- Coordinated sprinkler system corrections before completing ceiling repairs.
- Performed work within a densely packed storage area containing stage props and theatrical sets, requiring careful planning and material handling.
- Collaborated with DreamWrights staff, volunteers, the Board of Directors, and executive leadership throughout the project.
- Coordinated construction activities around active summer programs to minimize disruptions and maintain safe building access.
- Identified value engineering opportunities that reduced the overall scope and delivered cost savings to the client.