This project was a 23-acre, mixed-use commercial, retail, office and retirement living development, anchored by the renovation and reuse of four historic stone buildings, which form a town center cluster. Developed by Wagman and Susquehanna Real Estate (SRE), in association with Masonic Village at Elizabethtown, and with the cooperation of the Elizabethtown Economic Development Corporation […]
Market Archives:
York Revolution Baseball Stadium
Wagman completed the preconstruction and construction for York’s Atlantic League Baseball Stadium. The park holds 4,900 seats, 20 skyboxes and lawnseating facing the field. Amenities include catered picnic area, multi-function room, amusement area for children and a wide variety of concessions. Wagman was involved from the earliest stages assisting with site selection, financing, approvals and […]
DreamWrights Youth and Family Theatre – Theatre Renovations
Wagman provided pre-construction and construction services for DreamWright’s adaptive reuse of a 104-year old building that once served as a farmer’s market in the city of York. Renovations included the dramatic reshaping of the one-level theatre space into a state-of-the-art, two-story black box theatre. To create the black box, 3,800 SF of concrete deck and […]
Historic Fairmount Associates, LP – Historic Fairmount
Susquehanna Real Estate, LLC 1 – The Lofts on George Street
This 55,000 SF warehouse conversion created 17 residential upscale loft condominiums plus two commercial spaces in York City’s northern business district. Loft sizes range from 1,040 to 2,700 square feet, and each is distinct in design and features, from single to multi-floor units. Many feature dens, patios, roof decks and, or skyboxes. High ceilings, natural […]
110 North George Street, LP – Peterman Building
Waltersdorff Properties, LLC – Barton Associates Corporate Headquarters
Danville Cut & Cover
This $9 million project involved constructing a cut and cover tunnel under the borough of Danville, Pennsylvania. Wagman excavated to a depth over 40-feet and within five-feet of existing historic mansions. Wagman designed and constructed the shoring system required for the tunnel excavation.