Location
York, PA
-
Owner
DreamWrights Center for Community Arts
DreamWrights partnered exclusively with Wagman to investigate and resolve a failing ceiling assembly within its facility. Working on a time-and-materials basis, Wagman evaluated the existing conditions, identified the root cause of the issue, and developed a cost-effective repair solution.
The team determined that the existing sprinkler system was inadequately secured to the building structure, contributing to the ceiling failure. Wagman collaborated with a local sprinkler contractor to develop and implement a corrective plan before completing repairs to the ceiling assembly. Through continued investigation and value engineering during construction, the team identified a more efficient solution than originally anticipated, allowing the project to be completed in approximately one week for $20,000 and returning more than $3,000 in savings to the client.
Key Challenges & Project Details
- Investigated the cause of a failing ceiling assembly and developed a practical, cost-effective repair solution.
- Coordinated sprinkler system corrections before completing ceiling repairs.
- Performed work within a densely packed storage area containing stage props and theatrical sets, requiring careful planning and material handling.
- Collaborated with DreamWrights staff, volunteers, the Board of Directors, and executive leadership throughout the project.
- Coordinated construction activities around active summer programs to minimize disruptions and maintain safe building access.
- Identified value engineering opportunities that reduced the overall scope and delivered cost savings to the client.