Wagman Construction Project

DreamWrights Facility Repairs

  • Location

    York, PA

  • Owner

    DreamWrights Center for Community Arts

DreamWrights partnered exclusively with Wagman to investigate and resolve a failing ceiling assembly within its facility. Working on a time-and-materials basis, Wagman evaluated the existing conditions, identified the root cause of the issue, and developed a cost-effective repair solution.

The team determined that the existing sprinkler system was inadequately secured to the building structure, contributing to the ceiling failure. Wagman collaborated with a local sprinkler contractor to develop and implement a corrective plan before completing repairs to the ceiling assembly. Through continued investigation and value engineering during construction, the team identified a more efficient solution than originally anticipated, allowing the project to be completed in approximately one week for $20,000 and returning more than $3,000 in savings to the client.

Key Challenges & Project Details

  • Investigated the cause of a failing ceiling assembly and developed a practical, cost-effective repair solution.
  • Coordinated sprinkler system corrections before completing ceiling repairs.
  • Performed work within a densely packed storage area containing stage props and theatrical sets, requiring careful planning and material handling.
  • Collaborated with DreamWrights staff, volunteers, the Board of Directors, and executive leadership throughout the project.
  • Coordinated construction activities around active summer programs to minimize disruptions and maintain safe building access.
  • Identified value engineering opportunities that reduced the overall scope and delivered cost savings to the client.