Location
Hampton Roads, VA
-
Duration
August 2025 - January 2026
-
Owner
VDOT
Wagman’s Geotechnical Construction Group was contracted by Allan Myers to furnish and install a sound barrier wall for the Hampton Roads Express Lanes I-64 Segment 1A VDOT design-build project. This included drilling 36” diameter continuous flight auger (CFA) shafts and placing a full-length galvanized post and all required hardware. Once the wall was excavated, Wagman remobilized to place 299 retaining and sound barrier wall panels. Even though this project team had various challenges, Wagman was able to deliver this project ahead of schedule.
Key Challenges & Project Details
- Strict environmental controls. Enhanced E&S measures were implemented, including designated containment locations to manage drill and grout spiles and protect the adjacent stream.
- There was limited access to complete the drilling. Teams worked off the shoulder on I-64 to complete the work.