Wagman Heavy Civil Project

I-95 from North End of Fort McHenry Tunnel to I-895

  • Location

    Baltimore County, MD

  • Duration

    November 2004 – October 2006

This $23.5 million project involved rehabilitating bridges on I-95 in Baltimore County. Most of the work was located from the north end of the toll plaza to the I-895 merge. Work included scarifying and overlaying 22 bridges with Latex Modified Concrete/Rapid Set® Latex Modified Concrete, performing bridge joint and concrete parapet work, repairing miscellaneous structural steel on the bridges, asphalt paving, traffic control and other miscellaneous items.

Key Challenges & Project Details

  • Bridges: 22
  • 114,741 SY of Latex Modified Concrete & Rapid Set Latex Modified Concrete deck overlay
  • 7,400.22 CY of Latex Modified Concrete & Rapid Set Latex Modified Concrete
  • 2,762 SY of concrete deck repair
  • 49,256 tons of Hot Mix Asphalt Superpave
  • Major traffic control was required during construction on this heavily traveled Interstate