Wagman Heavy Civil Project

Baltimore Latex

  • Location

    Baltimore, MD

  • Duration

    2004 - 2008

These multi-phase projects involved multiple contracts to rehabilitate bridges along the I-95 and I-695 corridors utilizing latex modified concrete. All contracts were completed on time and under budget. Wagman placed an enormous emphasis on traffic maintenance and coordinating all of the individual projects.

Key Challenges & Project Details

  • Bridges: 45
  • Wagman placed 15,600 cubic yards of latex modified concrete, enough to cover 58 football fields, to a depth of 1.5 inches.
  • Work included scarifying, related bridge joint and parapet work, steel repairs to bridges, sign structures and other miscellaneous work.
  • Traffic counts indicated over 350 million vehicles passed through the work zone.