G.A. & F.C. Wagman, Inc. has decades of experience with marine construction as we have built hundreds of bridges spanning over various rivers and waterways.
Route 52 Causeway Bridges, NJ : Driving pile with floating rig - 300 ton ringer;60% of the structure is being built from the water
G.A. & F.C. Wagman, Inc. engages in various phases of marine construction including bridges, fender systems, dauphins, break walls, bulkheads, cofferdams, pile driving, dock construction and many other specialized marine projects. Wagman provides whatever is necessary to get the job done by providing experienced managers and operators, as well as tug boats, work boats, barges, cranes and pile hammers. Wagman’s Geotechnical Construction Services enhances Wagman’s position as a full service general contractor for complex Marine projects.
Route 52 Causeway Bridges, NJErecting cofferdam in Ocean City, NJ Crane on flexifloats, sheet pile on shuggart barges
Mill Creek Bridge, Tioga County, PAErecting steel from two floating 165-ton cranes
Mill Creek Bridge, Tioga County, PAPlacing reinforcing steel from flexi-floats
Youghiogheny River Bridge, PATwo floating rigs in Western, PA
Youghiogheny River Bridge, PATug pushing floating rig as it pulls the spud anchor, 2nd floating rig behind with steel caisson casing
Youghiogheny River Bridge, PAThree floating rigs with template system for caisson installation
Just a few of Wagman’s outstanding credentials
- Advanced technology
- Award-winning safety program
- Design-Build expertise
- Experienced management team
- Heavy equipment inventory maintained at headquarters
- Highly regarded industry leader
- Innovative engineering solutions
- Marine Inventory – Tugboats and segmental barges (flexifloats & shugarts)
- Over $500 million bonding capacity
- Self perform the majority of the work
- Skilled estimating team
