Danville Cut & Cover
Location Danville, PA
Duration June 1999 – January 2001
Description This $9 million project involved constructing a cut and cover tunnel under the borough of Danville, Pennsylvania. Wagman excavated to a depth over 40-feet and within five-feet of existing historic mansions. Wagman designed and constructed the shoring system required for the tunnel excavation.
Key Challenges & Project Details
- Wagman installed a 320 foot cut and cover tunnel in Danville’s historic district
- Including approaches, the total structure was over 650-feet long
- The project was designed to reflect the heritage of the surrounding areas
- The project allows traffic to pass below two blocks of the West Market Street Historic District, eliminating congestion
- The cut and cover tunnels transitions into Continental Boulevards, which connects to other major traffic routes