Fall 2007 – August 2010
New construction of 7.2 mainline miles, 3 interchanges, 7 dual bridges, 11 single bridges and 4 bridge widenings.
Bridge 6 mechanically stabilized earth wall abutment with piling.
Bridge 6 mechanically stabilized earth wall wing wall.
Bridge 6 mechanically stabilized earth wall leveling pad.