|

Although Wagman applies its experience and expertise
to all projects through engineering and careful scheduling, there is an
even greater opportunity to maximize the benefit with Alternate Design
& Design/Build Projects.
Alternate Design

Owners benefit from alternate design bids because
Wagman's expert team tailors the design to utilize the most efficient
materials and methods of construction. The result is reduced cost, while
maintaining structural integrity and meeting the owner's requirements.
Design/Build

Wagman can take incomplete design documents and identify
opportunities for enhancement and efficiency to complete the design, while
adhering to code. Like Alternate Design projects, Design/Build projects
offer owners the same benefits regarding material and methods. In addition,
time and costs are often reduced because Wagman, not the owner, is responsible
for complete plans. Another potential time saving advantage is that preliminary
work can begin while the design is being finalized.
Team Approach
Wagman partners with experienced design engineering
firms to perform the detailed design for Alternate Bid and Design/Build
projects. This team approach combines Wagman's construction experience
with the engineering firm's knowledge of detailed design procedures to
maximize quality and minimize cost.
|